Sign In | Join Free | My bushorchimp.com |
|
Brand Name : ECOOL
Model Number : EMP11
Certification : ISO9001;CCC
Place of Origin : CHINA
MOQ : 1 set
Price : Negotiable
Supply Ability : 5 set per year
Packaging Details : Standard Export Package
Delivery Time : 5-8 Working weeks
Product name : Modern Facility Low Temperature Cold Storage for Pork Processing Factory
Application : Storage frozen meat, frozen fishes, prepared food
Size : Customized
Structure : Steel structure and PU panel assembling
Refrigerant : R22,R404A,R507A
Warranty : 1 Year
Shipping way : by Sea
Capacity : 1000Tons/Month
Modern Facility Low Temperature Cold Storage For Pork Processing Factory
Quick details:
Cold room specification:
Room function | Designed temperature range | |
°C | °F | |
Blast freezing room | -35C | |
Pork Freezing and Fresh keeping Storage | -25~-18 | -13~-0.4 |
pre-chilling room | 0~5C | |
Corridor for temperary store | 0 | 32 |
Compatitive Advantages
Application
Pork processing factory, Logistics and Transfer center.
Steps of customized cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and price | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Cold room photos
![]() |
Modern Facility Low Temperature Cold Storage for Pork Processing Factory Images |